Commercial Project Data Request

Your project will be sent to our Engineering Department upon receipt of all requested information. 

Allow for a minimum of 45 days for installation.

County inspection on fuel line must be obtained before a meter is set.        

Questions? Contact our Energy Connection Center at 800.599.3770.

* Denotes a required field

Project

Street number(s) and street name of the job site should be listed as they appear on the permit. Please list all suites and/or addresses.

Contacts

Property Owner

Loads

BTU’s/hour input:
(if the project requires multiple meters, load must be separated for each suite/meter and suite identified)

ADDING
– Enter BTU's/hour input for each category that applies:

We can only provide certain standardized delivery pressures. Additional regulator(s) may need to be provided by the customer to deliver the desired pressure.       

Please attach scaled site plan with preferred meter location marked: